Contributed By Ali Khan Law Associates
There are five procurement regimes in Pakistan: one federal and four provincial.
The Procurement Laws (as defined below) under these regimes provide a legal and regulatory framework for public procurement by way of establishing an authority to regulate the public procurement of goods, services and works in the public sector, and by providing the rules and regulations governing procurement procedures.
At the federal level, the key legislation for procurement includes the Public Procurement Regulatory Authority Ordinance, 2002 (XXII of 2002) and the Public Procurement Rules, 2004. The following regulations were also made by the Public Procurement Regulatory Authority:
These procurement laws apply to all procurements made by the procuring agencies of the federal government within or outside Pakistan.
At the provincial level, the four provincial governments have their own procurement laws, whereby they have established respective public procurement authorities to regulate the procurement of government contracts made by the procuring agencies of the respective provincial governments.
The provincial laws are as follows (collectively the Procurement Laws).
The Procurement Laws provide the legal and regulatory framework for public procurement by way of establishing an authority to regulate the public procurement of goods, services and works in the public sector, and by providing rules and regulations governing procurement procedures. They apply to all procurements made by the relevant "procuring agencies", which are subject to the respective federal or provincial procurement regulation in relation to all procurements of goods, works and services made by them.
Procuring agencies have been defined by the Procurement Laws to include departments or offices of the respective federal or provincial government – ie, the government of Punjab, the government of Sindh, the government of Khyber Pakhtunkhwa (KPK) or the government of Balochistan, or any authority, corporation, body or organisation that is established by law or owned or controlled by the relevant federal or provincial government (as applicable).
Therefore, if any such procuring agency wishes to carry out procurements of goods, works and/or services, they may do so in accordance with the respective procurement regulation.
In general, contracts related to all procurements for goods, works or services, including consultancy services, carried out by all procuring agencies on the federal or provincial level are subject to procurement procedures. For purposes of clarity, goods, works and services are defined as follows:
However, there are certain exceptions to the procurements for goods, works and services within the Procurement Laws, including petty purchases, requests for quotations, direct contracting, negotiated tendering, force account, direct contracting with state-owned entities, repeat orders, etc.
It is pertinent to note that the minimum threshold requirements differ slightly within the various Procurement Laws in terms of monetary values. However, similar minimum thresholds entailing two tiers – ie, petty purchases and limited requests for quotations – exist within all legislative domains.
The regulated contract award procedure is undertaken through either the national competitive bidding process or the international competitive bidding process. The determination by the procuring agency of the type of bidding to be undertaken is based on multiple factors, including the technical complexity and financial value of the proposed project.
Participation in the regulated contract award procedure is based on the specific legal frameworks. By way of example, the Sindh Public Procurement Rules, 2010 (as amended) expressly bar the participation of international firms in a National Competitive Bidding process, which is not the case under other procurement frameworks. The Sindh Public Procurement Rules, 2010 (as amended) also provide for specific criteria to be considered to ascertain the national and international bidding requirements. However, other procurement frameworks only specify a variation in the response time for national and international bidding, of 15 and 30 days respectively.
The openness of participation is also subject to other legal requirements, beyond the requirements of the Procurement Laws. By way of example, in order to undertake engineering works, the Pakistan Engineering Council (PEC) requires entities undertaking such work to procure a licence from the PEC. Furthermore, as per PEC laws, international entities are either required to have a PEC licence or to enter into a joint venture arrangement with a local partner that has a PEC licence.
In light of the above, it is clear that participation is not completely open to all participants; it is subject to the various restrictions stated above, and also to the following:
The key obligations under the Procurement Laws can be divided into two categories:
Details of these obligations fare stipulated below, but it is critical to highlight that the Procurement Laws are skewing towards a greater obligation for the procuring agencies.
Obligations of the Procuring Agencies
The procuring agencies are required to abide by the “principles of procurements”, which require them to ensure fairness and transparency, value for money and efficiency. They are also required to undertake various procedural obligations as part of the bidding process.
The procedural obligations begin with the preparation of procurement plans. Under the Procurement Laws, each procuring agency is required to plan the procurement for each succeeding year, and are then required to procure the approvals of the competent authorities for such procurement plans.
In executing the approved procurement plans, the procuring agencies have to undertake extensive work even before such procurement is advertised. The preparation of the bidding documents is a critical part of the obligations of the procuring agency, which requires the procuring agency to not only assess all legal, technical and financial aspects of the procurement but also to prepare bidding documents that include evaluation criteria for prospective bidders.
Following the preparation of the bidding documents, the procuring agency is also responsible for the advertisement of the bid, the provision of clarifications to prospective bidders, the acceptance of the bids, the technical and financial evaluation and the award of the contract to the most responsive bidder (in light of the evaluation criteria).
Obligations of the Bidders
The bidders are required to ensure that the minimum eligibility criteria and the requirements of the bidding process, as detailed in the request for proposal, are met.
The Procurement Laws mandate the prior advertisement of regulated procurement contract awards. However, it is crucial to note that such advertisements have various financial thresholds, which vary at the federal and provincial levels.
Financial Threshold and Relevant Publication Requirement
Federal level
At the federal level, all procurements of between PKR500,000 and PKR3 million are advertised on the Public Procurement Regulatory Authority’s website, while all procurement opportunities above PKR3 million are advertised on the authority’s website and in other print media or newspapers with wide circulation. These advertisements must also appear in at least two national dailies – one in English and the other in Urdu.
Sindh
In Sindh, procurements of between PKR100,000 and PKR1 million are advertised by timely notifications on the Sindh Public Procurement Regulatory Authority’s website, while all procurement opportunities above PKR1 million are advertised on the authority’s website as well as in the newspapers, as prescribed. The advertisement in the newspapers shall appear in at least three widely circulated leading dailies in the English, Urdu and Sindhi languages. If the procuring agency has its own website, it shall also post all advertisements concerning procurement on that website.
KPK
In KPK, procurements of between PKR100,000 and PKR2.5 million shall be posted on the procuring entity’s website or the KPK Public Procurement Regulatory Authority's website, or both. These procurement opportunities may also be advertised in print media, if doing so is deemed necessary by the procuring agency, in at least one national English and one Urdu daily newspaper with nationwide circulation, along with advertising the same on either the procuring entity's website or the authority's website, or both.
Punjab
In Punjab, a procuring agency must advertise procurements of between PKR200,000 and PKR3 million on the website of the Punjab Procurement Regulatory Authority. Any procurement exceeding PKR3 million shall be advertised on the website of the authority and the website of the procuring agency, and in at least two national daily newspapers of wide circulation, one in English and one in Urdu. However, the requirement for advertisement shall be removed if the proposed procurement pertains to national security and the information is of such a proprietary nature or falls within the definition of intellectual property.
Balochistan
In Balochistan, procurements of between PKR200,000 and PKR2 million are advertised by timely notifications on the Balochistan Public Procurement Regulatory Authority’s website. These procurement opportunities may also be advertised in print media. All procurement opportunities over PKR2 million are advertised on the authority’s website and published in at least two widely circulated leading dailies in the English and Urdu languages.
Non-exhaustive Contents of the Advertisement
According to all Procurement Laws, the advertisement must contain the following common elements:
There is no mandatory requirement under the Procurement Laws for the awarding authority to carry out preliminary market consultations before launching the contract award procedure. However, it is market practice for the technical adviser of the procuring agency to conduct a feasibility study to ascertain pricing to benchmark the bid prices with the market prices.
The general process of a public tender under the Procurement Laws is as follows.
Procurement Planning Stage
All procuring agencies devise a mechanism for planning all proposed procurements in detail, determining the requirement of the procuring agencies within their available resources, and prepare comprehensive plans detailing the procurement methods applicable for specific procurements.
Pre-qualification of Contractors/Bidders
Pre-qualification is an assessment made by the procuring agency of the experience and capacity of the firms expressing interest in undertaking a particular contract, prior to the issuance of invitations to bid through the publication of a pre-qualification notice, the receipt of submissions and the evaluation of submissions against pre-defined criteria. A decision on whether or not to use pre-qualification may be made at the procurement planning stage.
Advertisement
Procurements above a certain identified financial value must be advertised on the authority’s website and in other print media or newspapers with wide circulation, as applicable (see 2.1 Prior Advertisement of Regulated Contract Award Procedures).
Bidding Documents
The procuring agency must provide the bidding documents to all interested bidders in accordance with the procedures and requirements specified in the notice inviting tender.
Clarification and Modification of Bidding Documents
An interested bidder who has obtained bidding documents may request clarification of the contents of the bidding document in writing, and the procuring agency shall respond to such queries in writing.
Submission/Opening of Bids
The deadline for the submission of bids is mentioned in the bidding documents. The procuring agency may extend the deadline for the submission of bids in accordance with the procuring regulation. Bids are submitted according to the place, date and time specified in the tender notice and bidding documents, and in the manner specified therein. The date for the opening of bids and the last date for the submission of bids is the same.
Evaluation of Bids
All bids are evaluated in accordance with the evaluation criteria and other terms and conditions set forth in the bidding documents.
Publication of the Award of Contract
Within a defined number of days, a procuring agency must publish the results of the bidding process on the website of the relevant authority and on its own website (if such website exists), identifying the bid through the procurement identifying number (if any) and the following information (as applicable):
Award of Contract
A procuring agency may undertake limited negotiations with the highest ranked bidder regarding the methodology, work plan, staffing and special conditions of the contract. If such negotiations fail, the procuring agency may invite the second ranked consultant as per the evaluation report. There shall be no negotiations with the bidder who entered the lowest evaluated bid or any bid other than as allowed under the Procurement Laws.
Under the procurement legislation, the principal method of procurement utilised by the procuring agencies for the procurement of goods, services and works is open competitive bidding, which is further divided into two tiers: national competitive bidding, and international competitive bidding.
The Procurement Laws provide for more than one tender procedure, especially with regards to the bidding process, but the choice of procedure is not at the sole discretion of the awarding authority. In fact, such procedures are subject to the fulfilment of certain conditions, as described below.
The Procurement Laws do not impose any obligations as to the timing for the publication of any or all of the procurement documents. However, they generally state that the procuring agency may decide the response time for the receipt of bids or proposals (including proposals for pre-qualification) from the date of publication of an advertisement or notice, keeping in mind the complexity, availability and urgency of the individual procurement.
Additionally, all advertisements or notices shall expressly mention the response time allowed for that particular procurement, along with the information for the collection of bid documents, which shall be issued until a given date, allowing sufficient time to complete and submit the bid by the closing date.
Some specifications with regards to minimum time thresholds have been provided in the Procurement Laws. For example, under Punjab, KPK, Balochistan and the federal legislation, the response time cannot be less than 15 days for national competitive bidding and 30 days for international competitive bidding. In Sindh, the response time to notifications and advertisements must not be less than 15 days for national competitive bidding and 30 days under Rule 18 of the Sindh Public Procurement Rules. Moreover, the Sindh procurement regulations allows not less than 45 days for international competitive bidding and between 60 and120 days for procurements of large works or complex items.
Similar time provisions exist for the publication of awards on the websites of the relevant authorities and the procuring agency’s own website, but these are subject to variations within the different legislative domains.
A request for expressions of interest shall be advertised, giving adequate notice, keeping in mind the underlying principle that the applicants must be given adequate time for the preparation of bids.
The procuring agency may decide the response time for the receipt of bids or proposals from the date of the publication of an advertisement or notice, keeping in mind the complexity of the procurement, availability and urgency, but in no circumstances can the response time be less than 15 days from the date of publication of the advertisement or notice for national competitive bidding, or 30 days for international competitive bidding. However, in Sindh and Balochistan, the response time should not be less than 45 days from the date of publication of the notice inviting tender in the case of international competitive bidding.
Apart from the participation restrictions vis-à-vis international competitive bidding and national competitive bidding under the relevant Procurement Laws, the following requirements restrict the eligibility of participants:
Moreover, for the hiring of a consultant for an assignment, the procuring agency needs to ensure that there is no possibility of any conflict of interest. If a consultant has been engaged by the procuring agency to provide goods or works for a project, it shall be disqualified from providing consulting services for the same project. Furthermore, a consultant should not be hired for any assignment that, by its nature, may be in conflict with another assignment of the consultant.
The implementation of a pre-qualification process is used to restrict participation in the procurement process. Pre-qualification is an assessment made by the procuring agency of the experience and capacity of bidders expressing interest in undertaking a particular contract, prior to the issuance of invitations to bid. The basic aim of the pre-qualification is to eliminate unrealistic, unqualified or disreputable contractors that are not suitably qualified to perform the contract. This is achieved through the publication of a pre-qualification notice, the receipt of submissions and the evaluation of submissions against pre-defined criteria. However, its use is not mandatory under the Procurement Laws. A decision on whether or not to use pre-qualification may be made at the procurement planning stage.
A procuring agency may engage in the pre-qualification of bidders in the following cases:
Basis for Shortlisting
The pre-qualification of prospective bidders shall be based entirely upon their capability and resources to perform the particular contract satisfactorily, which shall be evaluated in terms of the criteria set forth in the notices or bidding documents, taking the following into account:
Minimum Number of Qualified Bidders
Even though the Procurement Laws do not mention the minimum number of qualified bidders, there are provisions that (subject to certain conditions) allow for a single bidder to be pre-qualified. However, departmental guidelines have been developed to cater to this issue. By way of example, the Planning and Development Department of the Government of Punjab allows for the shortlisting of at least three individual consultants, firms or companies for each area of expertise, with such list to be uploaded on the authority’s website.
Evaluation Criteria
The evaluation criteria are developed by the procuring agencies as part of the procurement planning and in view of the specific requirements for each procurement. They are an express and integral part of the bidding documents and, as such, failure to provide unambiguous evaluation criteria in the bidding documents amounts to mis-procurement. All bids are evaluated in accordance with the evaluation criteria and other terms and conditions set forth in the bidding documents.
It is important to highlight that the specific evaluation criteria are developed with the technicality of the procurement in mind. By way of example, the evaluation criteria will be more stringent for a transaction adviser being sought for a mega road project than for a simple stationery supply contract.
Determination of Winner
The winner of the procurement procedure is determined using a detailed evaluation against the criteria set out for each procurement. The procuring agency (either on its own or through a transaction adviser) is required to seek clarifications (if any), to prepare and publish a detailed evaluation report specifying the deviations and/or compliance with the evaluation criteria for each bidder, and to specify the preferred bidder in each case. The preferred bidder is then notified of the outcome and the procuring agency proceeds to finalise the procurement through the issuance of a letter of award to the preferred bidder (subject to no other issues arising).
Obligation to Disclose Criteria or Other Elements of Evaluation Methodology
The Procurement Laws are clear and require not only the disclosure of the unambiguous evaluation criteria in the bidding documents issued to prospective bidders but also that the bidding documents include instructions for preparing bids, the manner and place of the submission of bids, the method of procurement used, the manner in which tender price is to be assessed and computed, etc.
Over and above the specific obligations relating to the disclosures of selection in the Procurement Laws, the procuring agencies include various other disclosures in their bidding documents, such as minimum eligibility requirements, the grounds for blacklisting and/or exclusion and complete evaluation methodologies, allowing a reasonable opportunity for bidders to take account of the methodology when preparing their submissions.
The evaluation criteria are arithmetic in nature – ie, they provide for how each credential is marked against a pre-determined number. By way of example, a typical legal advisory evaluation criterion would stipulate a maximum number of marks for a post-graduate qualification of the applicant and a lower mark for an applicant that has an undergraduate degree only.
Timing of Disclosure
Since disclosure requirements are part of the bidding documents, the timing of the disclosure is the same as the timing of the publication of bids. Even though an initial evaluation criterion is published as part of the bidding documents, the procuring agency may use bidders’ queries as part of market sounding and use their discretion (subject to procedural requirements under the Procurement Laws) to amend the criteria.
Under the Procurement Laws, the procuring agency is required to publish a detailed evaluation report incorporating a detailed evaluation for each bidder and containing the reasoning for the acceptance and/or rejection of a bid.
Based upon the procedure adopted for the respective procurement, the procuring agency must also announce the result of a bid evaluation, in the form of a final evaluation report giving justification for the acceptance or rejection of bids, at least 15 days prior to the award of the procurement contract at the federal level. A similar criterion for informing rejected bidders exists in Punjab, but the minimum notification period is ten days prior to the award of the contract.
In Sindh, procuring agencies must announce the results of a bid evaluation in the form of a report giving reasons for the acceptance or rejection of bids. The report must be posted on the websites of the authority and the procuring agency (if such website exists) and communicated to all bidders at least seven days prior to the award of the contract. A similar criterion for informing rejected bidders exists in KPK and Balochistan, but the minimum notification periods are, respectively, ten days and three days prior to the award of a contract.
Furthermore, under the procurement rules in Sindh, a bidder may ask the procuring agency for the reasons for non-acceptance of their bid and may request a debriefing meeting. The procuring agency shall give the reasons for such non-acceptance, either in writing or by holding a debriefing meeting with such a bidder. However, the requesting bidder shall bear all the costs of attending such a debriefing.
The evaluation report is published on the relevant procurement website and on the website of the procuring agency.
Additionally, upon the request of any bidder, the procuring agency must communicate the grounds for its rejection of all bids or proposals, but it is not required to justify those grounds.
In order to notify bidders of the contract award decision, procuring agencies must announce the results of the bid evaluation in the form of a report giving reasons for the acceptance or rejection of bids. The report must be posted on the websites of the authority and of the procuring agency (if such website exists), and communicated to all the bidders. The same criteria exist throughout the legislative domains in Pakistan, but the minimum notification period varies slightly under each domain.
There is no standard “standstill period” under the Procurement Laws.
For federal procurement laws, an aggrieved bidder may lodge a written complaint within seven days of the announcement of the technical evaluation report and within five days of the issuance of the final evaluation report.
In Sindh, there is no specified time period for grievance redressal.
In Punjab, the complainant must challenge the decision within ten days of the bid evaluation report being published.
The relevant procuring agency must constitute a committee with the appropriate powers and authorisation to address the complaints of bidders that may occur prior to the entry into force of the procurement contract. Any bidder that is aggrieved by a decision of the procuring agency may lodge a written complaint. Upon receiving a complaint, the complaint redressal committee may reject the complaint or reverse the decision, provided that the complaint redressal committee does not make any decision to award the contract; the procuring agency shall award the contract after the decision of the complaint redressal committee. Any bidder that is not satisfied with the decision of the committee may file an appeal in the relevant court of jurisdiction. However, there are certain matters that are not subject to appeal or review, including the following:
A breach of the procurement legislation is treated as mis-procurement. In the case of a material violation of the provisions of the procurement legislation, orders, instructions or any other law relating to public procurement, the authority may take notice of such violation and declare the case to be one of mis-procurement if such violation has been established. Upon the declaration of mis-procurement, the head of the department or the relevant authority must refer the case to the competent authority for the initiation of disciplinary proceedings against the officials of the procuring agency responsible for the mis-procurement, and may also refer the matter to the anti-corruption establishment concerned for initiating action against such officials. The person responsible for such breach shall be liable under the relevant law.
In the case of a complaint filed to the complaint redressal committee as described in 4.1 Responsibility for Review of the Awarding Authority's Decisions, the procuring agency shall award the contract after the decision of the complaint redressal committee. However, the mere fact of a complaint having been lodged shall not warrant the suspension of the procurement proceedings.
Any bidder that is aggrieved by a decision of the procuring agency may lodge a written complaint with the complaint redressal committee, which may take several measures as provided in the procurement legislation. However, the complaint redressal committee shall not make any decision to award the contract.
The Procurement Laws state that, based upon the procedure adopted for the respective procurement, the procuring agency must also announce the result of the bid evaluation, in the form of a final evaluation report giving justification for the acceptance or rejection of bids, within the following timeframes:
The timeframe for challenging the awarding authority’s decision commences upon the announcement of the procuring agency’s result of the bid evaluation in the form of a final evaluation report, and expires when the relevant time period between such announcement and the award of the contract runs out. For instance, in Punjab the complainant must challenge the decision within ten days of the final evaluation report being published.
The actual length of proceedings cannot be strictly determined. However, the Procurement Laws provide for certain guidelines, which are as follows:
The exact number of procurement claims each year cannot be ascertained since it is not public information. Official sources claim that more than 1,000 claims are filed each year. However, the resolution rate is only about 10–15%.
Typical costs cannot be determined since the costs are dependent upon a number of factors, including the technicality of the challenge, the involvement of legal/financial/technical experts and the length of proceedings.
The Procurement Laws do not provide for the unfettered modification of contracts following the finalisation of a successful bidder, but they do provide for limited negotiations of contracts.
The Procurement Laws generally state that, without changing the cost and scope of work or services, the procuring agency may negotiate with the successful bidder on the methodology, work plan, staffing and special conditions of the contract. The authority may determine the extent and types of negotiations on procurement by regulations.
However, the Sindh, KPK and Balochistan rules also provide non-negotiable aspects of the contract, including:
If negotiations fail, the relevant procuring agency may invite the second ranked bidder as per the evaluation report.
The award of procurement contracts can generally be divided into four major categories:
The interplay between the utilisation of petty purchases, requests for quotations and open competitive bidding and the circumstances under which each category may be utilised are stipulated in the Procurement Laws.
However, the legislation also provides for a fourth category, by which contracts may be awarded directly. Under direct contracting, procurement may be conducted from a single source without competition. This method is subject to certain limitations, including:
Please note that this list is neither exhaustive nor specific to a certain jurisdiction; it merely aims to provide an overview of the possible circumstances under which direct contracting might take place.
The Procurement Laws often warrant judicial scrutiny due to a lack of natural justice, transparency and fairness in the procurement process. This leads to judicial intervention whereby the courts decide upon a principle within the procurement regime to bring clarity and fairness to the process.
A recent decision of the Islamabad High Court titled “National Institutional Facilitation Technologies (Pvt.) Limited v The Federal Board of Revenue" (PLD 2020 Islamabad 378) is of significant importance as it clarified the legal implications and scope of the governmental agency soliciting clarification from bidders upon submission of their bids.
The court was asked to determine the scope of powers a governmental agency can exercise vis-à-vis the submitted bid upon the receipt of clarifications from the bidder. It opined that, upon the receipt of clarifications from a bidder, a submitted bid may be modified to the extent that the “substance of the bid” is not modified.
Therefore, the High Court was of the view that even a correction of a clerical error, wherein the bidder misquoted the cumulative price of the bid by stating the price of stamps as “PKR0.731 per 1,000 stamps” instead of “PKR731 per 1,000 stamps”, would change the substance of the bid and provide an opportunity for the bidder to improve their bid. Hence, even the rectification of a misquoted amount in the financial bid is beyond the scope of the term “clarification” and the bidder was not permitted to rectify their clerical error as it would offend the principles of natural justice and transparency of the procurement process.
While the Procurements Laws have undergone extensive amendments during past years, there is no available information about currently contemplated amendments.
Office 402, 4th Floor, 186-C, Lane 3
D.H.A. Phase 8 Zulfiqar & Al Murtaza Commercial Area Phase 8 Defence Housing Authority,
Karachi
Pakistan
+922 13 534 6017
+922 13 534 6016
akla@akla.com.pk www.akla.com.pk